Published date:

Harrison Sidings

Points Heating

Harrison Sidings is a remote location in Cumbria, to which GrayBar's Self-Regulating Points Heating was ideally suited.

Harrison Sidings - Case Study

 

GrayBar installed what was originally a single-phase cubicle, this was then upgraded to three-phase when renewals took place.

The design of Self-Regularing Points Heating with the transformers built into the cubicle lends itself perfectly for applications such as this, giving reduced Civils' work, as only one concrete base is required due to there being no trackside transformers.

Our system is the perfect solution for location such as these, along with depots and stations where space is at a premium.


 

 

GrayBar offer a comprehensive range of Tram Point Heating solutions, in: stainless steel, mid steel, and GRP.

Contact us for more details.