Published date:

Three Bridges Train Care Facility

Points Heating

The purpose-built Three Bridges train-care facility in Crawley, West Sussex, was completed in Summer 2015 and is a maintenance depot for the GTR Thameslink route, the depot stables and maintains a state-of-the-art Class 700 fleet.


Three Bridges Case Study

 

The new facility was built and commissioned minimising disruption to the existing live operational depot and mainline services.

GrayBar were specified and supplied a total of six Cubicles for 18 Point Ends, along with Heaters and Junction Boxes.

GrayBar's unique design was a perfect fit for the depot, with both the Control Gear and Transformers being in one cubicle, enabled the depot to continue to be operational throughout.